Key Project Components

Date

20 September 2016

Categories

mechanical, power energy

Key Project Components

  • 350 MW Combined Cycle Gas Turbine (CCGT) with multiple fuel (light crude oil, distillate and natural gas) operating capability.
  • A 161 kV substation for power transmission.
  • Circa 2 kilometer natural gas pipeline connecting the power plant with the West Africa Gas Pipeline
  • • Light Crude Oil (LCO) fuel supply, delivery and treatment facilities, including two onsite storage tanks with a total capacity of about 18,000m3, as well as offsite LCO storage tanks with a capacity of about 70,000m3.
  • Working Capital funding for fuel